Water Treatment

Since 1924 the District has relied on its wellfield located on Puente Avenue in the City of Baldwin Park as its primary source of providing pure and wholesome drinking water to our customers. In 1991, contamination levels of volatile organic compounds (VOCs) in the wellfield began to exceed the maximum contamination levels set by the California Department of Public Health (CDPH).  The District took prompt action and in 1992, installed a 1,500-gpm air stripping facility to remove VOC’s (pictured below). As a result of the continued migration of the contamination, the District installed an additional 1,500-gpm air stripping facility in 1995; the cost to install these facilities was over one million dollars.
 
Beginning in June 1997, several new chemicals not previously identified as a concern were discovered at the District wellfield. These chemicals are perchlorate, NDMA and 1,4-dioxane. Upon their discovery, the District took immediate action by removing these wells from service and purchasing water from adjoining water agencies at a great expense. At that time no proven treatment technology existed for the removal of these new chemicals from drinking water. In the summer of 1998, the District issued a nationwide request for proposal to find a treatment technology capable of treating these chemicals. In the fall of 1998, the District received a proposal from Calgon Carbon Corporation with performance-based assurances that these chemicals could be successfully removed. The Main San Gabriel Basin Watermaster, San Gabriel Basin Water Quality Authority, and Upper San Gabriel Valley Municipal Water District funded the five million dollar project. On January 12, 2000, the funding agencies received reimbursement for the capital costs of this project from the parties responsible for the contamination. Construction began on the project during June 1999 and was completed in February 2000. 
Beginning in June 1997, several new chemicals not previously identified as a concern were discovered at the District wellfield. These chemicals are perchlorate, NDMA and 1,4-dioxane. Upon their discovery, the District took immediate action by removing these wells from service and purchasing water from adjoining water agencies at a great expense. At that time no proven treatment technology existed for the removal of these new chemicals from drinking water. In the summer of 1998, the District issued a nationwide request for proposal to find a treatment technology capable of treating these chemicals. In the fall of 1998, the District received a proposal from Calgon Carbon Corporation with performance based assurances that these chemicals could be successfully removed. The Main San Gabriel Basin Watermaster, San Gabriel Basin Water Quality Authority, and Upper San Gabriel Valley Municipal Water District funded the five million dollar project. On January 12, 2000, the funding agencies received reimbursement for the capital costs of this project from the parties responsible for the contamination. Construction began on the project during June 1999 and was completed February 2000. 
 
The District’s groundwater clean-up facilities consist of three wells located on Puente Avenue in the City of Baldwin Park, two parallel air stripping towers, one ion exchange system, one hydrogen peroxide injection system, two ultraviolet light reactors operating in series and a booster pump station. After treatment, the water is piped to the District’s Hudson Booster Station located in the City of La Puente and pumped into the District’s water system. The water is closely monitored and tested to assure that the water delivered to the public complies with all Federal and State drinking water regulations. The Treatment Plant has a capacity of 2,500 gallons per minute. This meets 100 percent of the District’s water needs. 
The Treatment Facility includes separate treatment components that have been designed to treat specific types of contaminants. The air stripping towers are designed to remove VOC’s to below detection levels. The air stripping facilities consist of two air-stripping towers that are operated in parallel configuration, as the groundwater flows over the packing towers, the VOC’s are transferred from the water to the air flowing in a counter-current direction, the carbon vessel then removes the VOC’s in the air and the remaining clean air is then released to atmosphere. The treated groundwater flows by gravity into a 15,000 gallon wet well.

The water is then pumped from the wet well using two vertical turbine booster pumps into the single pass ion exchange systems. The single pass ion exchange system uses resin material that is designed for the selective removal of the contaminant perchlorate. This process is much like a household water softening system. However, this system does not require regeneration using salt water, like most other ion exchange processes. Based on water quality results, the resin is changed out with fresh resin approximately every 6 months. 
After passing through the ion exchange process, the water treated is injected with hydrogen peroxide prior to entry into the UV reactors. Each reactor tower contains a total of 384 ultraviolet (UV) lamps. Water enters the reactor from one side, flows through and exits the reactor on the opposite side. Each lamp is horizontally mounted and crosses through the reactor while emitting ultraviolet light, which is absorbed by the NDMA and1,4-dioxane. Destruction of 1,4-dioxane requires the addition of hydrogen peroxide, which forms hydroxyl radicals in water. NDMA destruction is also enhanced by the addition of hydrogen peroxide. Under the influence of UV light, the hydroxyl radicals oxidize 1,4-dioxane. NDMA is destroyed by direct photolysis when exposed to UV light. The treated water exiting the facility typically has no detectable levels of VOC’s, perchlorate, NDMA or 1,4-dioxane and consistently complies with CDPH water quality standards. Water exiting the treatment facility is chlorinated with a free chlorine residual of at least 0.2 mg/L through the distribution system. After the water has gone through the three treatment processes it is delivered to the District’s Hudson Booster Station. This booster stations pumps water into the District’s water distribution system.
 
The District firmly believes that this treatment plant not only provides a safe and reliable supply of drinking water to our community, but also preserves a natural resource for future generations of area residents.
 

Questions About Water Service?

*Please complete the form below. All fields are required.

La Puente Water District
112 N First St.
La Puente, CA 91744
Hours of Operation
Mon-Thr: 8:00am to 5:00pm
Fri: 7:00am to 3:00pm
Phone: 626.330.2126
Fax: 626.330.2679